They completed the installation of the lower 100ft retaining wall. Well almost, still have to put on about 15 top caps. Larry wanted to get the wall in prior to the foundation because, due to the location of the existing septic field, it would have been hard to get heavy machinery into this area after the foundation was in. Here are some pictures of the wall and some of the construction.
Follow along during the design and construction of a new colonial home in Northern NJ.